htmlstart boat . June 2010 - Boat
jpg 100601_5048m . 1 BC EB Center line drawn
jpg 100601_5049m . 1 BC EB Martha ready to go fishing
jpg 100602_5058m . 1 BC EB Inlet Navigation delivering plywood for boat hull
jpg 100602_5060m . 1 BC EB Inlet Navigation delivering plywood for boat hull
jpg 100602_5080m . 1 BC EB Greg and Scott moving plywood to net loft
jpg 100602_5079m . 1 BC EB Greg and Scott moving plywood to net loft
jpg 100602_5077m . 1 BC EB Greg and Scott moving plywood to net loft
jpg 100602_5074m . 1 BC EB Scott and Greg
jpg 100602_5075m . 1 BC EB Scott and Greg
jpg 100602_5082m . 1 BC EB Plywood ready for use
jpg 100603_5091m . 1 BC EB Working on frame 2
jpg 100603_5093m . 1 BC EB Frames 1 to 8 up, ready to test for fairness
jpg 100606_5115m . 1 BC EB Because of the height of our building platform,
the stem forepeak is below the floor.
Peter is cutting a hole to accomodate it.
jpg 100606_5116m . 1 BC EB 100606_5116m
jpg 100606_5118m . 1 BC EB "Stem hole"
jpg 100607_5121m . 1 BC EB Frames 1 through 8. Transom to come.
jpg 100607_5124m . 1 BC EB Frame 1 (foreground)
jpg 100607_5125m . 1 BC EB 100607_5125m
jpg 100608_5130m . 1 BC EB Two 3/4" plywood boards will be epoxy glued
face to face to make the 1-1/2" transom
jpg 100608_5132m . 1 BC EB Transom boards glued and weighted flat
jpg 100609_5137m . 1 BC EB Nice router table given to us by John
jpg 100609_5138m . 1 BC EB Softening the edge of a frame
jpg 100610_5140m . 1 BC EB Sawing transom to finished height
jpg 100610_5142m . 1 BC EB Sawing transom side
jpg 100610_5147m . 1 BC EB Transom sawn to final dimensions
jpg 100611_5148m . 1 BC EB Transom waiting for epoxy
jpg 100611_5149m . 1 BC EB Epoxying transom
jpg 100611_5152m . 1 BC EB Frames waiting to be glued
jpg 100612_5171m . 1 BC EB Applying epoxy glue to a frame
jpg 100617_5205m . 1 BC EB Sanding frames before another coat of epoxy
jpg 100617_5206m . 1 BC EB All frames sanded, washed and drying
jpg 100619_1290p . 1 BC EB Martha tipping third layer of epoxy
jpg 100619_1293p . 1 BC EB Martha tipping third layer of epoxy
jpg 100620_5217m . 1 BC EB Washing yet another epoxyed frame
jpg 100621_5244m . 1 BC EB Attaching keelson support
jpg 100621_5235m . 1 BC EB Transom with a layer of fiberglassed cloth
and epoxy
jpg 100621_5246m . 1 BC EB Trimming excess cloth from transom
jpg 100622_5247m . 1 BC EB Preparing keelson support blocks
jpg 100622_5248m . 1 BC EB Frames with keelson support blocks installed
jpg 100622_5250m . 1 BC EB Foreground and top, keelson support blocks
installed. Glued dowels will be cut off.
jpg 100624_5255m . 1 BC EB Checking to see if transom is on center
jpg 100626_5289m . 1 BC EB Cutting notch for keelson
jpg 100627_5298m . 1 BC EB Scribing a line on the stem board
jpg 100626_5292m . 1 BC EB Stem board and frames
jpg 100629_5312m . 1 BC EB Keelson boards set up for epoxying
jpg 100630_5320m . 1 BC EB Progress!
Attaching first keelson board to frames
jpg 100630_5321m . 1 BC EB Attaching keelson board to stem
jpg 100630_5323m . 1 BC EB Attaching end of second layer of keelson.
It is epoxy glued and screwed to the first board.