htmlstart snipe . July 2009 - Snipe Project
jpg 090703_045p . 1 BC EB Martha sanding inside the hull
jpg 090705_049p . 1 BC EB Varnishing inside
jpg 090717_3621m . 1 BC EB Laying out the part shown in the next picture
jpg 090718_3623m . 1 BC EB Deck support with hole for mast
jpg 090718_3624m . 1 BC EB The rear sections of rub rails had come loose.
Attaching them with epoxy glue and clamps.
jpg 090718_3625m . 1 BC EB Clamps and ropes galore
jpg 090718_3627m . 1 BC EB New foredeck and mast support in place
jpg 090718_3628m . 1 BC EB Progress
jpg 090718_3631m . 1 BC EB Our OSHA certified work space
jpg 090720_3649m . 1 BC EB Mrking new deck panel
jpg 090721_3652m . 1 BC EB Deck panels roughed in
jpg 090721_3663m . 1 BC EB 090721_3663m
jpg 090721_3683m . 1 BC EB 090721_3683m
jpg 090721_3689m . 1 BC EB Sun on sea grass
jpg 090721_3695m . 1 BC EB Brrrr
jpg 090722_3697m . 1 BC EB Snipe fittings
jpg 090723_3701m . 1 BC EB Getting ready to invert
jpg 090723_3706m . 1 BC EB Starting to roll over
jpg 090723_3708m . 1 BC EB Rolling
jpg 090723_3709m . 1 BC EB Inverted
jpg 090724_3715m . 1 BC EB Ready for bottom work
jpg 090724_3717m . 1 BC EB 090724_3717m
jpg 090709_579m . 1 BC EB Hull partially stripped
jpg 090710_051p . 1 BC EB Martha with paint stripper and scraper
jpg 090713_3595m . 1 BC EB Doug George checking sails
jpg 090710_3590m . 1 BC EB Hull after stripping with paint remover
jpg 090713_3597m . 1 BC EB Doug and Peter sanding
jpg 090713_3602m . 1 BC EB Hull clean, proud papa
jpg 090713_3606m . 1 BC EB A large epoxy fill. One of many Doug George
tricks: top to bottom: rock, board, plastic,
epoxy filler, hull. The trick keeps the fill flat
so there is less sanding.
jpg 090713_3605m . 1 BC EB Filling rub rail gap with thickened epoxy
jpg 090713_3608m . 1 BC EB Patching rough spots
jpg 090715_3615m . 1 BC EB Martha varnishing
jpg 090715_3619m . 1 BC EB First varnish coat done
jpg 090717_3620m . 1 BC EB Milo is very interested in the Snipe project
jpg 090725_3725m . 1 BC EB Peter varnishing
jpg 090725_3732m . 1 BC EB Martha varnishing
jpg 090725_3734m . 1 BC EB First coat complete
jpg 090730_063p . 1 BC EB Hull sanded, ready for second coat of varnish
jpg 090730_068p . 1 BC EB Second coat of varnish completed
jpg 090730_074p . 1 BC EB Anatomy of a patch: a bad place in plywood
filled with epoxy thickended with filler.
jpg 090730_075p . 1 BC EB Covered with plastic
jpg 090730_076p . 1 BC EB Then a board
jpg 090730_077p . 1 BC EB Finally, some weight
jpg 090731_079p . 1 BC EB Inverting alone requires use of a winch,
at left, mounted on the beam
jpg 090731_081p . 1 BC EB Ropes, pulleys,etc. (flash picture)
jpg 090731_082p . 1 BC EB The box in foreground (with red &
black wires) is the winch control
jpg 090731_084p . 1 BC EB More ropes and pulleys
jpg 090731_085p . 1 BC EB Part way through the invert
jpg 090731_086p . 1 BC EB Right side up and only minor damage
jpg 090801_087p . 1 BC EB Mast hole trim piece
jpg 090801_088p . 1 BC EB Chain plate
htmlend