May 15 - At the dam to replace the intake filter

20170515_1991.jpg
Edna Bay, BC - 2017
Just removed the cap from the upper 6" drain pipe

20170515_1994.jpg
Edna Bay, BC - 2017
Lower drain pipe cap removed

20170515_1996.jpg
Edna Bay, BC - 2017
Removing old filter

20170515_1997.jpg
Edna Bay, BC - 2017
Removing a section of unneeded pipe

20170515_1999.jpg
Edna Bay, BC - 2017
Installing new filter

20170515_2001.jpg
Edna Bay, BC - 2017
Replacing drain caps