May 2014 - Boat Building

140518_1825.jpg
Edna Bay, BC - 2014
Looking forward

140518_1828.jpg
Edna Bay, BC - 2014
Looking aft

140523_1863.jpg
Edna Bay, BC - 2014
6 sheets 3/4" marine plywood

140523_1864.jpg
Edna Bay, BC - 2014
Plywood dolly

140523_150321_wc3.jpg
Edna Bay, BC - 2014
Moving 3/4" plywood to net loft

140525_1873.jpg
Edna Bay, BC - 2014
Winching 40 hp Yamaha into net loft

140525_1872.jpg
Edna Bay, BC - 2014
140525_1873

140525_1875.jpg
Edna Bay, BC - 2014
140525_1875

140527_1913.jpg
Edna Bay, BC - 2014
We rigged this way, then realized
there must be a lifting point

140527_1914.jpg
Edna Bay, BC - 2014
Winched by the lifting point, ready
to be bolted to the prototype
motor mount

140527_1915.jpg
Edna Bay, BC - 2014
Drilling bolt holes

140527_1917.jpg
Edna Bay, BC - 2014
I am able to hold up the 250 lb
motor with my bare hands

140527_1918.jpg
Edna Bay, BC - 2014
Bolted home

140527_1919.jpg
Edna Bay, BC - 2014
140527_1919

140527_1920.jpg
Edna Bay, BC - 2014
140527_1920

140527_1922.jpg
Edna Bay, BC - 2014
140527_1922

140525_1885.jpg
Edna Bay, BC - 2014
Sanding joints to be filleted

140527_1924.jpg
Edna Bay, BC - 2014
Our first filleting attempt