140518_1825.jpg Edna Bay, BC - 2014 Looking forward
| 140518_1828.jpg Edna Bay, BC - 2014 Looking aft
| 140523_1863.jpg Edna Bay, BC - 2014 6 sheets 3/4" marine plywood
|
140523_1864.jpg Edna Bay, BC - 2014 Plywood dolly
| 140523_150321_wc3.jpg Edna Bay, BC - 2014 Moving 3/4" plywood to net loft
| 140525_1873.jpg Edna Bay, BC - 2014 Winching 40 hp Yamaha into net loft
|
140525_1872.jpg Edna Bay, BC - 2014 140525_1873
| 140525_1875.jpg Edna Bay, BC - 2014 140525_1875
| 140527_1913.jpg Edna Bay, BC - 2014 We rigged this way, then realized there must be a lifting point
|
140527_1914.jpg Edna Bay, BC - 2014 Winched by the lifting point, ready to be bolted to the prototype motor mount
| 140527_1915.jpg Edna Bay, BC - 2014 Drilling bolt holes
| 140527_1917.jpg Edna Bay, BC - 2014 I am able to hold up the 250 lb motor with my bare hands
|
140527_1918.jpg Edna Bay, BC - 2014 Bolted home
| 140527_1919.jpg Edna Bay, BC - 2014 140527_1919
| 140527_1920.jpg Edna Bay, BC - 2014 140527_1920
|
140527_1922.jpg Edna Bay, BC - 2014 140527_1922
| 140525_1885.jpg Edna Bay, BC - 2014 Sanding joints to be filleted
| 140527_1924.jpg Edna Bay, BC - 2014 Our first filleting attempt
|