September 2011 - Boat Building

110901_0782m.jpg
Edna Bay, BC - 2011
Washing a bottom panel in the net loft shower

110902_0788m.jpg
Edna Bay, BC - 2011
Making a side trimming guide -
John gave us his extra band saw

110908_0833m.jpg
Edna Bay, BC - 2011
John and Peter strategizing

110908_0834m.jpg
Edna Bay, BC - 2011
Marking a bottom panel for attaching to frames

110908_0835m.jpg
Edna Bay, BC - 2011
Marking a bottom panel for attaching to frames

110912_0850m.jpg
Edna Bay, BC - 2011
John fairing the keelson

110913_0852m.jpg
Edna Bay, BC - 2011
Attaching a strip to double the side thickness
between frames 1 and 2 - to give more screwing
and gluing area for the bottom where it bends a lot

110913_0853m.jpg
Edna Bay, BC - 2011
Attaching strips to double the side thickness
between frames 1 and 2 - to give more screwing
and gluing area for the bottom where it bends a lot

110914_0859m.jpg
Edna Bay, BC - 2011
Wednesday morning and John and Martha
have bent on 15 ft. of bottom paneling.
It will sit for a few days and hopefully learn
its new shape. Then it will be removed,
glued and reattached.

110914_0861m.jpg
Edna Bay, BC - 2011
110914_0861m

110914_0862m.jpg
Edna Bay, BC - 2011
110914_0862m

110914_0865m.jpg
Edna Bay, BC - 2011
Marha and brother John

110914_0867m.jpg
Edna Bay, BC - 2011
110914_0867m

110914_0872m.jpg
Edna Bay, BC - 2011
110914_0872m

110917_0889m.jpg
Edna Bay, BC - 2011
Installing port side chine logs

110907_0832m.jpg
Edna Bay, BC - 2011
John

110921_0901m.jpg
Edna Bay, BC - 2011
Doug George kerfing foward bottom panel

110921_0906m.jpg
Edna Bay, BC - 2011
110921_0906m

110925_0965m.jpg
Edna Bay, BC - 2011
110925_0965m

110925_0968m.jpg
Edna Bay, BC - 2011
110925_0968m