021208_11.jpg Sonora Island, BC - 2003 George Stephenson's sawmill (Dec. 2002)
| 021208_07.jpg Sonora Island, BC - 2003 George with a salvaged old growth fir (Dec. 2002)
| 030217_05.jpg Sonora Island, BC - 2003 Leaving George's with a load of lumber for the hottub (Feb. 2003)
|
030218_03.jpg Edna Bay, BC - 2003 Hot tub lumber stacked for drying (Feb. 2003)
| 030616_01m.jpg Edna Bay, BC - 2003 Planning the hot tub on the house deck No, it won't be located here
| 030615_06m.jpg Edna Bay, BC - 2003 Peter masking up to begin planing hot tub boards
|
030615_12m.jpg Edna Bay, BC - 2003 Peter scribing 7' hot tub outline
| 030615_16m.jpg Edna Bay, BC - 2003 Martha and boards for the hot tub floor
| 030616_05m.jpg Edna Bay, BC - 2003 Section of hot tub floor glued and clamped
|
030617_03m.jpg Edna Bay, BC - 2003 Peter scribing outline on hot tub floor
| 030617_04m.jpg Edna Bay, BC - 2003 Peter scribing outline on hot tub floor
| 030618_02m.jpg Edna Bay, BC - 2003 Two sections of hot tub floor glued and braced
|
030619_05m.jpg Edna Bay, BC - 2003 Last two sections of floor glued and "clamped"
| 030620_02m.jpg Edna Bay, BC - 2003 Hot tub side boards planed and ready for next step
| 030620_03m.jpg Edna Bay, BC - 2003 Shallow hot tub
|
030621_01m.jpg Edna Bay, BC - 2003 Spacing the beams on the uncut floor
| 030621_04m.jpg Edna Bay, BC - 2003 Checking to see how the center beam goes with the lay of the land
| 030621_05m.jpg Edna Bay, BC - 2003 Sizing up the location of the pier blocks
|
030622_01m.jpg Edna Bay, BC - 2003 Flipping the hot tub floor so the up side is up
| 030622_04m.jpg Edna Bay, BC - 2003 Half way flipped
| 030622_05m.jpg Edna Bay, BC - 2003 On its way over
|
030622_07m.jpg Edna Bay, BC - 2003 Martha enjoying a hot tub
| 030622_09m.jpg Edna Bay, BC - 2003 Peter scribing the circle to cut
| 030622_11m.jpg Edna Bay, BC - 2003 Hot tub bottom now a circle
|
030622_12m.jpg Edna Bay, BC - 2003 Hot tub bottom
| 030622_05p.jpg Edna Bay, BC - 2003 Pier blocks assembled for the foundation
| 030623_02m.jpg Edna Bay, BC - 2003 Setting the Clamp 'n Guide
|
030623_03m.jpg Edna Bay, BC - 2003 Cutting a true edge with the help of the guide
| 030623_05m.jpg Edna Bay, BC - 2003 Cutting the other edge true
| 030623_07m.jpg Edna Bay, BC - 2003 The jig we used to cut the bottom circle
|
030623_09m.jpg Edna Bay, BC - 2003 Cutting the dado
| 030623_12m.jpg Edna Bay, BC - 2003 Our gorgeous hot tub side boards
| 030623_14m.jpg Edna Bay, BC - 2003 The first cuts of the dado the rest will be done with a router
|
030624_08m.jpg Edna Bay, BC - 2003 Clamping so the boards don't move while routing the dado
| 030624_05m.jpg Edna Bay, BC - 2003 Routing the dado
| 030624_09m.jpg Edna Bay, BC - 2003 Routing the dado
|
030624_12m.jpg Edna Bay, BC - 2003 Checking the pier block bed for rough level
| 030624_15m.jpg Edna Bay, BC - 2003 Carpenter's clutter
| 030624_16m.jpg Edna Bay, BC - 2003 Center beam in place
|
030624_13m.jpg Edna Bay, BC - 2003 Laborer delivering another beam to the job site
| 030625_07m.jpg Edna Bay, BC - 2003 Custom foundation masonry
| 030625_08m.jpg Edna Bay, BC - 2003 Two beams in place
|
030625_10m.jpg Edna Bay, BC - 2003 Digging a hole for another pier block
| 030625_14m.jpg Edna Bay, BC - 2003 Martha adding sand to level the pier block bed
| 030625_17m.jpg Edna Bay, BC - 2003 All beams in place and level
|
030625_22m.jpg Edna Bay, BC - 2003 030625_22m
| 030625_21m.jpg Edna Bay, BC - 2003 Sanding the floor
| 030625_23m.jpg Edna Bay, BC - 2003 Martha positioning the floor on the beams
|
030625_24m.jpg Edna Bay, BC - 2003 The floor in place
| 030625_29m.jpg Edna Bay, BC - 2003 Whew! A long day
| 030625_30m.jpg Edna Bay, BC - 2003 View from the deck
|
030626_03p.jpg Edna Bay, BC - 2003 Martha sanding the side boards
| 030626_01p.jpg Edna Bay, BC - 2003 Another one finished
| 030626_01m.jpg Edna Bay, BC - 2003 Peter making a jig to hold up the sides during assembly
|
030626_02m.jpg Edna Bay, BC - 2003 Adding to the jig
| 030626_03m.jpg Edna Bay, BC - 2003 Scribing lines to center the side boards
| 030628p_06.jpg Edna Bay, BC - 2003 Hottub taking shape
|
030628m_01.jpg Edna Bay, BC - 2003 Peter adjusting the leg of the spider
| 030628m_04.jpg Edna Bay, BC - 2003 Foxglove and hottub
| 030628m_05.jpg Edna Bay, BC - 2003 Peter putting in the last side board
|
030628m_09.jpg Edna Bay, BC - 2003 Hot tub held together with duct tape
| 030628m_11.jpg Edna Bay, BC - 2003 Hot tub held together with steel straps
| 030628m_15.jpg Edna Bay, BC - 2003 George Stephenson and Peter
|
030711_02.jpg Edna Bay, BC - 2003 Partially dismantling the hot tub to reposition some wall boards. So they won't fall down the hoops are tied to the four gizmos on top the wall.
| 030711_08.jpg Edna Bay, BC - 2003 Sample of Sikaflex caulking - tomorrow we Sikaflex the hot tub joint where the wall and bottom meet.
| 030714_05.jpg Edna Bay, BC - 2003 Hot tub deck - sample joists. The sticks mark where posts will be.
|
030715_08.jpg Edna Bay, BC - 2003 Four concrete footings for hot tub deck posts
| 030715_21.jpg Edna Bay, BC - 2003 Back yard
| 030716_06.jpg Edna Bay, BC - 2003 Misty day - working on footings and posts for the deck
|
030716_07.jpg Edna Bay, BC - 2003 Two deck posts in place
| 030718_16.jpg Edna Bay, BC - 2003 Two new footings - new design - hole filled with beach rocks with concrete pad on top
| 030720_08.jpg Edna Bay, BC - 2003 030720_08 Planning placement of steps
|
030721_05.jpg Edna Bay, BC - 2003 July 21 - the deck is taking shape
| 030723_01.jpg Edna Bay, BC - 2003 Snorkel hot tub stove, stove pipe, cedar boards for fence
| 030723_02.jpg Edna Bay, BC - 2003 Four more deck footings "poured"
|
030725_01.jpg Edna Bay, BC - 2003 Trial deck board
| 030725_02.jpg Edna Bay, BC - 2003 Trial deck board
| 030720_13.jpg Edna Bay, BC - 2003 030720_13
|
030720_15.jpg Edna Bay, BC - 2003 030720_15
| 030721_06.jpg Edna Bay, BC - 2003 030721_06
| 030724_06.jpg Edna Bay, BC - 2003 030724_06
|
030728_01.jpg Edna Bay, BC - 2003 Deck posts tied to hot tub support beams
| 030728_02.jpg Edna Bay, BC - 2003 Decking starting to go in
| 030728_03.jpg Edna Bay, BC - 2003 Decking starting to go in
|
030729_02.jpg Edna Bay, BC - 2003 Decking done for now - no more lumber
| 030729_04.jpg Edna Bay, BC - 2003 Hot tub stove moved to deck
| 030729_05.jpg Edna Bay, BC - 2003 Laying out the lower landing for the steps
|
030730_01.jpg Edna Bay, BC - 2003 Landing frame positioned in its hole
| 030730_02.jpg Edna Bay, BC - 2003 A little concrete to hold it in place
| 030730_06.jpg Edna Bay, BC - 2003 Add rocks and gravel from the beach
|
030730_07.jpg Edna Bay, BC - 2003 A layer of concrete
| 030730_08.jpg Edna Bay, BC - 2003 And the surface layer of bricks
| 030730_09.jpg Edna Bay, BC - 2003 Prototype whatchamacallit (the carpenter is having a little trouble with the steps and we have limited lumber)
|
030804m_20.jpg Edna Bay, BC - 2003 Steps under construction
| 030804m_22.jpg Edna Bay, BC - 2003 Peter working on steps
| 030804m_23.jpg Edna Bay, BC - 2003 Martha on completed steps
|
030811m_06.jpg Edna Bay, BC - 2003 August 11 - Martha trying out the "hot" tub with 16 inches of water
| 030812m_03.jpg Edna Bay, BC - 2003 Stove installed, fence started
| 030812m_09.jpg Edna Bay, BC - 2003 Stove and fence installed
|
030812m_08.jpg Edna Bay, BC - 2003 Martha and the stove fence
| 030812m_11.jpg Edna Bay, BC - 2003 Martha in the hot tub - hot water tomorrow
| 030813m_15.jpg Edna Bay, BC - 2003 Peter feeding the stove
|
030813m_17.jpg Edna Bay, BC - 2003 Martha and Ducky
| 030813m_18.jpg Edna Bay, BC - 2003 Peter
| 030813m_19.jpg Edna Bay, BC - 2003 Ducky in corral
|
030815p_02.jpg Edna Bay, BC - 2003 Martha enjoying a tub
| 030813p_04.jpg Edna Bay, BC - 2003 Martha and Peter in the hot tub
|