 20191003_3193.jpg Edna Bay, BC - 2019 Controls installed. Working on forward helm.
|  20191003_3195.jpg Edna Bay, BC - 2019 Exiting the fo'c'sle
|  20191004_3196.jpg Edna Bay, BC - 2019 Setting up to cut lengths of stainless tubing
|
 20191004_3197.jpg Edna Bay, BC - 2019 Adjusting to cut 10"
|  20191004_3205.jpg Edna Bay, BC - 2019 Cutting with angle grinder and cut-off disc
|  20191004_3206.jpg Edna Bay, BC - 2019 Three railing stanchions in place temporarily
|
 20191004_3207.jpg Edna Bay, BC - 2019 Testing for rail height
|  20191005_3215.jpg Edna Bay, BC - 2019 Drilling for railing base bolts
|  20191005_3216.jpg Edna Bay, BC - 2019 Attaching a railing base
|
 20191005_3217.jpg Edna Bay, BC - 2019 Starboard railing bases bolted (temporary)
|  20191006_3220.jpg Edna Bay, BC - 2019 Cutting a long section of railing
|  20191006_3225.jpg Edna Bay, BC - 2019 Railings installed temporarily. We are short the 4' transom piece.
|
 20191006_3228.jpg Edna Bay, BC - 2019 Port railing
|  20191007_3232.jpg Edna Bay, BC - 2019 Looking down at railing angle issue
|  20191009_3242.jpg Edna Bay, BC - 2019 Grab rails installed
|
 20191010_3245.jpg Edna Bay, BC - 2019 Jig to position motor mount
|  20191010_3244.jpg Edna Bay, BC - 2019 Motor mount positioned for hole drilling
|  20191010_3247.jpg Edna Bay, BC - 2019 Motor mount installed
|
 20191013_3249.jpg Edna Bay, BC - 2019 Marking drill hole for foredeck cleat
|  20191013_3250.jpg Edna Bay, BC - 2019 Drilling foredeck cleat hole
|  20191013_3251.jpg Edna Bay, BC - 2019 Applying sealant to window frame
|
 20191013_3252.jpg Edna Bay, BC - 2019 Aft helm window installed
|  20191014_3254.jpg Edna Bay, BC - 2019 Caulking port side window
|  20191014_3255.jpg Edna Bay, BC - 2019 Screwing window home
|
 20191015_3258.jpg Edna Bay, BC - 2019 Securing port windshield
|  20191015_3263.jpg Edna Bay, BC - 2019 Windshields installed
|  20191016_3274.jpg Edna Bay, BC - 2019 All windows installed
|
 20191017_3276.jpg Edna Bay, BC - 2019 Martha giving the cabin door a shower
|  20191017_3277.jpg Edna Bay, BC - 2019 Door clean, ready to install. Gunwales painted with non-skid.
|  20191018_3281.jpg Edna Bay, BC - 2019 Jig for bending 1/4" copper tubing
|
 20191018_3282.jpg Edna Bay, BC - 2019 Working on dual controls shift junction connections
|  20191019_3286.jpg Edna Bay, BC - 2019 Working on dual controls shift junction connections
|  20191019_3287.jpg Edna Bay, BC - 2019 Working on dual controls shift junction connections
|
 20191021_3292.jpg Edna Bay, BC - 2019 One of seven bilge breather tubes. Without these the bilge comartments would be air tight.
|  20191022_3295.jpg Edna Bay, BC - 2019 Securing a breather tube to frame
|  20191022_3297.jpg Edna Bay, BC - 2019 Breather tubes and cleats installed
|
 20191023_3301.jpg Edna Bay, BC - 2019 Butyl sealant applied - door ready to install
|  20191023_3304.jpg Edna Bay, BC - 2019 Screwing in interior door frame
|  20191023_3305.jpg Edna Bay, BC - 2019 Cabin door installed
|
 20191023_3305.jpg Edna Bay, BC - 2019 Installing afterdeck railings
|  20191024_3316.jpg Edna Bay, BC - 2019 The last railing cut
|  20191024_3318.jpg Edna Bay, BC - 2019 Securing railing set screws
|
 20191024_3322.jpg Edna Bay, BC - 2019 Looking good
|  20191024_3323.jpg Edna Bay, BC - 2019 Railing complete
|  20191030_3330.jpg Edna Bay, BC - 2019 October 30 - we have done all we can this year
|
 20191030_3331.jpg Edna Bay, BC - 2019 Only a few days work to be done in 2020
|