 150809_0913.jpg Edna Bay, BC - 2015 Taking up bent cabin roof supports
|  150813_0943.jpg Edna Bay, BC - 2015 Bow floor joints filleted
|  150809_0910.jpg Edna Bay, BC - 2015 Step down from afterdeck to cabin sole
|
 150809_0911.jpg Edna Bay, BC - 2015 Installing step down facing
|  150813_0951.jpg Edna Bay, BC - 2015 Step down facing epoxyed
|  150815_0961.jpg Edna Bay, BC - 2015 Epoxying a cabin panel
|
 150815_0958.jpg Edna Bay, BC - 2015 Glassing a cabin panel
|  150818_0967.jpg Edna Bay, BC - 2015 Cabin aft wall: two sides attached to bottom piece
|  150818_0973.jpg Edna Bay, BC - 2015 Cabin aft wall: two sides, bottom and top pieces attached
|
 150819_0976.jpg Edna Bay, BC - 2015 Aft cabin wall in place temporarily
|  150819_0978.jpg Edna Bay, BC - 2015 Cutting fiberglass cloth
|  150820_0982.jpg Edna Bay, BC - 2015 Aft cabin wall (upside down) washed, ready for sanding and two coats of fairing
|
 150821_0992.jpg Edna Bay, BC - 2015 Cutting roof line in aft cabin wall
|  150821_0994.jpg Edna Bay, BC - 2015 Aft cabin wall: applying epoxy with filler for smooth surface
|  150823_0997.jpg Edna Bay, BC - 2015 Painting with epoxy prior to gluing
|
 150823_0998.jpg Edna Bay, BC - 2015 Aft cabin wall glued and clamped - at last!
|  150824_1010.jpg Edna Bay, BC - 2015 Aft cabin wall done
|  150824_1012.jpg Edna Bay, BC - 2015 Cabin roof supports glued and clamped
|
 150827_1021.jpg Edna Bay, BC - 2015 John fairing forward sheer
|  150829_1024.jpg Edna Bay, BC - 2015 John working on gunwale
|  150829_1026.jpg Edna Bay, BC - 2015 Foredeck supports installed
|