 100517_4900m.jpg Edna Bay, BC - 2010 X marks the forepeak
|  100517_4901m.jpg Edna Bay, BC - 2010 Drawing table
|  100517_4902m.jpg Edna Bay, BC - 2010 Frame layout (lofting)
|
 100517_4903m.jpg Edna Bay, BC - 2010 100517_4903m
|  100517_4904m.jpg Edna Bay, BC - 2010 Lofting lines
|  100519_4913m.jpg Edna Bay, BC - 2010 Flags marking the bow outliine on net loft floor
|
 100519_4914m.jpg Edna Bay, BC - 2010 Setting building platform uprights
|  100520_4927m.jpg Edna Bay, BC - 2010 Additional lighting
|  100520_4929m.jpg Edna Bay, BC - 2010 Building platform uprights
|
 100520_4931m.jpg Edna Bay, BC - 2010 100520_4931m
|  100521_4935m.jpg Edna Bay, BC - 2010 A logjam on our way to Heriot Bay - to pick up plywood
|  100521_4958m.jpg Edna Bay, BC - 2010 Plywood hauled and stored
|
 100522_4959m.jpg Edna Bay, BC - 2010 Marking rail slots
|  100522_4961m.jpg Edna Bay, BC - 2010 Rail slots cut
|  100522_4962m.jpg Edna Bay, BC - 2010 Typical working position
|
 100522_4963m.jpg Edna Bay, BC - 2010 Installing rails
|  100523_4964m.jpg Edna Bay, BC - 2010 Long boards are for the keelson
|  100523_4965m.jpg Edna Bay, BC - 2010 Assembling frame 8
|
 100524_4968m.jpg Edna Bay, BC - 2010 100524_4968m
|  100524_4970m.jpg Edna Bay, BC - 2010 Starting on bulkheads
|  100525_4972m.jpg Edna Bay, BC - 2010 Frame 4 posing
|
 100525_4973m.jpg Edna Bay, BC - 2010 100525_4973m
|  100525_4974m.jpg Edna Bay, BC - 2010 Bulkhead layout
|  100525_4976m.jpg Edna Bay, BC - 2010 100525_4976m
|
 100526_4979m.jpg Edna Bay, BC - 2010 100526_4979m
|  100526_4980m.jpg Edna Bay, BC - 2010 100526_4980m
|  100526_4981m.jpg Edna Bay, BC - 2010 100526_4981m
|
 100527_4985m.jpg Edna Bay, BC - 2010 100527_4985m
|  100528_4988m.jpg Edna Bay, BC - 2010 100528_4988m
|  100528_4994m.jpg Edna Bay, BC - 2010 100528_4994m
|
 100528_4996m.jpg Edna Bay, BC - 2010 100528_4996m
|  100529_5001m.jpg Edna Bay, BC - 2010 100529_5001m
|  100530_5003m.jpg Edna Bay, BC - 2010 Building platform with rails and stack of frames on right
|
 100531_5015m.jpg Edna Bay, BC - 2010 Leveling the level
|  100531_5018m.jpg Edna Bay, BC - 2010 Leveling the building rails - hand signals to rod holder
|  100531_5024m.jpg Edna Bay, BC - 2010 The center line will be drawn on the center board
|