 090703_045p.jpg Edna Bay, BC - 2009 Martha sanding inside the hull
|  090705_049p.jpg Edna Bay, BC - 2009 Varnishing inside
|  090717_3621m.jpg Edna Bay, BC - 2009 Laying out the part shown in the next picture
|
 090718_3623m.jpg Edna Bay, BC - 2009 Deck support with hole for mast
|  090718_3624m.jpg Edna Bay, BC - 2009 The rear sections of rub rails had come loose. Attaching them with epoxy glue and clamps.
|  090718_3625m.jpg Edna Bay, BC - 2009 Clamps and ropes galore
|
 090718_3627m.jpg Edna Bay, BC - 2009 New foredeck and mast support in place
|  090718_3628m.jpg Edna Bay, BC - 2009 Progress
|  090718_3631m.jpg Edna Bay, BC - 2009 Our OSHA certified work space
|
 090720_3649m.jpg Edna Bay, BC - 2009 Mrking new deck panel
|  090721_3652m.jpg Edna Bay, BC - 2009 Deck panels roughed in
|  090721_3663m.jpg Edna Bay, BC - 2009 090721_3663m
|
 090721_3683m.jpg Edna Bay, BC - 2009 090721_3683m
|  090721_3689m.jpg Edna Bay, BC - 2009 Sun on sea grass
|  090721_3695m.jpg Edna Bay, BC - 2009 Brrrr
|
 090722_3697m.jpg Edna Bay, BC - 2009 Snipe fittings
|  090723_3701m.jpg Edna Bay, BC - 2009 Getting ready to invert
|  090723_3706m.jpg Edna Bay, BC - 2009 Starting to roll over
|
 090723_3708m.jpg Edna Bay, BC - 2009 Rolling
|  090723_3709m.jpg Edna Bay, BC - 2009 Inverted
|  090724_3715m.jpg Edna Bay, BC - 2009 Ready for bottom work
|
 090724_3717m.jpg Edna Bay, BC - 2009 090724_3717m
|  090709_579m.jpg Edna Bay, BC - 2009 Hull partially stripped
|  090710_051p.jpg Edna Bay, BC - 2009 Martha with paint stripper and scraper
|
 090713_3595m.jpg Edna Bay, BC - 2009 Doug George checking sails
|  090710_3590m.jpg Edna Bay, BC - 2009 Hull after stripping with paint remover
|  090713_3597m.jpg Edna Bay, BC - 2009 Doug and Peter sanding
|
 090713_3602m.jpg Edna Bay, BC - 2009 Hull clean, proud papa
|  090713_3606m.jpg Edna Bay, BC - 2009 A large epoxy fill. One of many Doug George tricks: top to bottom: rock, board, plastic, epoxy filler, hull. The trick keeps the fill flat so there is less sanding.
|  090713_3605m.jpg Edna Bay, BC - 2009 Filling rub rail gap with thickened epoxy
|
 090713_3608m.jpg Edna Bay, BC - 2009 Patching rough spots
|  090715_3615m.jpg Edna Bay, BC - 2009 Martha varnishing
|  090715_3619m.jpg Edna Bay, BC - 2009 First varnish coat done
|
 090717_3620m.jpg Edna Bay, BC - 2009 Milo is very interested in the Snipe project
|  090725_3725m.jpg Edna Bay, BC - 2009 Peter varnishing
|  090725_3732m.jpg Edna Bay, BC - 2009 Martha varnishing
|
 090725_3734m.jpg Edna Bay, BC - 2009 First coat complete
|  090730_063p.jpg Edna Bay, BC - 2009 Hull sanded, ready for second coat of varnish
|  090730_068p.jpg Edna Bay, BC - 2009 Second coat of varnish completed
|
 090730_074p.jpg Edna Bay, BC - 2009 Anatomy of a patch: a bad place in plywood filled with epoxy thickended with filler.
|  090730_075p.jpg Edna Bay, BC - 2009 Covered with plastic
|  090730_076p.jpg Edna Bay, BC - 2009 Then a board
|
 090730_077p.jpg Edna Bay, BC - 2009 Finally, some weight
|  090731_079p.jpg Edna Bay, BC - 2009 Inverting alone requires use of a winch, at left, mounted on the beam
|  090731_081p.jpg Edna Bay, BC - 2009 Ropes, pulleys,etc. (flash picture)
|
 090731_082p.jpg Edna Bay, BC - 2009 The box in foreground (with red & black wires) is the winch control
|  090731_084p.jpg Edna Bay, BC - 2009 More ropes and pulleys
|  090731_085p.jpg Edna Bay, BC - 2009 Part way through the invert
|
 090731_086p.jpg Edna Bay, BC - 2009 Right side up and only minor damage
|  090801_087p.jpg Edna Bay, BC - 2009 Mast hole trim piece
|  090801_088p.jpg Edna Bay, BC - 2009 Chain plate
|