 070819_0984m.jpg Edna Bay, BC - 2007 The ledger is in place
|  070822_1006m.jpg Edna Bay, BC - 2007 Removing bolts in order to take out the old deck posts
|  070822_1007am.jpg Edna Bay, BC - 2007 Removing bolts in order to take out the old deck posts
|
 070822_1011m.jpg Edna Bay, BC - 2007 Couldn't get the nuts loose so split out the post and hacksaw the bolts
|  070822_1012m.jpg Edna Bay, BC - 2007 Old posts all removed
|  070823_1015m.jpg Edna Bay, BC - 2007 Two new posts in place
|
 070823_1017m.jpg Edna Bay, BC - 2007 Four new posts in place
|  070823_1019m.jpg Edna Bay, BC - 2007 9:30PM - Marine Link delivering deck lumber
|  070823_1022m.jpg Edna Bay, BC - 2007 Deck lumber
|
 070823_1024m.jpg Edna Bay, BC - 2007 Hoisting lumber to the wharf
|  070823_1027m.jpg Edna Bay, BC - 2007 Marine Link departing
|  070823_1029m.jpg Edna Bay, BC - 2007 Headed to another drop on SI, then up Bute Inlet They started at 6AM
|
 070824_1032m.jpg Edna Bay, BC - 2007 Now Martha and I have to get busy
|  070824_1034m.jpg Edna Bay, BC - 2007 Measuring for a cross brace
|  070824_1039m.jpg Edna Bay, BC - 2007 Testing to see if 4 foot cantilever is too much. It isn't.
|
 070824_1040m.jpg Edna Bay, BC - 2007 Two beams in
|  070825_1047m.jpg Edna Bay, BC - 2007 Heavy dragging
|  070825_1048m.jpg Edna Bay, BC - 2007 Break time
|
 070825_1052m.jpg Edna Bay, BC - 2007 Three beams
|  070826_1053m.jpg Edna Bay, BC - 2007 Four beams
|  070826_1054m.jpg Edna Bay, BC - 2007 Modern art
|
 070826_1055m.jpg Edna Bay, BC - 2007 A step in getting a beam in place
|  070826_1056m.jpg Edna Bay, BC - 2007 Ready to lift the house end into place
|  070826_1059m.jpg Edna Bay, BC - 2007 Carpenter Martha
|
 070826_1062m.jpg Edna Bay, BC - 2007 All in
|  070827_1068m.jpg Edna Bay, BC - 2007 Peter contemplating the chop saw
|  070827_1069m.jpg Edna Bay, BC - 2007 Deck in progress
|
 070828_1071m.jpg Edna Bay, BC - 2007 Three joists in, working on four
|  070828_1072m.jpg Edna Bay, BC - 2007 070828_1072m
|  070828_1074m.jpg Edna Bay, BC - 2007 Nice float house and boat being towed south
|
 070829_1079m.jpg Edna Bay, BC - 2007 Placing a Strongtie
|  070829_1083m.jpg Edna Bay, BC - 2007 070829_1083m
|  070829_1087m.jpg Edna Bay, BC - 2007 End of day 8/29
|
 070830_1093m.jpg Edna Bay, BC - 2007 070830_1093m
|  070830_1095m.jpg Edna Bay, BC - 2007 070830_1095m
|  070831_1105m.jpg Edna Bay, BC - 2007 Chipping out a knot befor planing a rail post
|
 070831_1106m.jpg Edna Bay, BC - 2007 070831_1106m
|  070831_1107m.jpg Edna Bay, BC - 2007 Placing a railing post
|  070831_1110m.jpg Edna Bay, BC - 2007 One railing post done, measuring for number two
|
 070831_1111m.jpg Edna Bay, BC - 2007 Two done
|  070831_1112m.jpg Edna Bay, BC - 2007 Seven railing posts done
|  070831_1113m.jpg Edna Bay, BC - 2007 070831_1113m
|