 040702_04.jpg Stuart Island, BC - 2004 Hauling the concrete mixer to Edna Bay
|  040703_23.jpg Edna Bay, BC - 2004 Mixer ready to go down the beach steps
|  040703_24.jpg Edna Bay, BC - 2004 Whew! We made it
|
 040703_25.jpg Edna Bay, BC - 2004 Mixer positioned for pouring
|  040703_26.jpg Edna Bay, BC - 2004 Mixer positioned for pouring
|  040703_29.jpg Edna Bay, BC - 2004 Five sacks cement and a cubic yard of aggregate
|
 040703_30.jpg Edna Bay, BC - 2004 Peter helping homogenize the mix We lowered aggregate and cement in buckets
|  040703_31.jpg Edna Bay, BC - 2004 Mixer hoisted out of the tide's way
|  040704_35.jpg Edna Bay, BC - 2004 Two more forms built- pier block to weigh them down when the tide comes in
|
 040705_01.jpg Edna Bay, BC - 2004 The forms floated up and dumped the pier block. It wasn't enough weight.
|  040705_02.jpg Edna Bay, BC - 2004 Another view
|  040705_03.jpg Edna Bay, BC - 2004 The crane used to hoist the mixer out of the tide's way
|
 040705_04.jpg Edna Bay, BC - 2004 Peter with a bucket of aggregate
|  040705_05.jpg Edna Bay, BC - 2004 We rigged a chute for getting aggregate to the mixer - easier than lowering it in the bucket
|  040705_06.jpg Edna Bay, BC - 2004 Funnel into the chute
|
 040705_07.jpg Edna Bay, BC - 2004 Looking down the chute
|  040705_08.jpg Edna Bay, BC - 2004 Chuting aggregate to the mixer
|  040705_09.jpg Edna Bay, BC - 2004 Mixing - the camera lady about to get sprayed
|
 040705_12.jpg Edna Bay, BC - 2004 Finishing the surface
|  040705_13.jpg Edna Bay, BC - 2004 Grid poured
|  040705_14.jpg Edna Bay, BC - 2004 Mixer being winched up the steps
|
 040706_03.jpg Edna Bay, BC - 2004 Grid beams from the wharf
|  040709_01.jpg Edna Bay, BC - 2004 Mixer on its way back to Sea Lion Rock Lodge
|  040713_02.jpg Edna Bay, BC - 2004 7/13/04: Forms removed and side bracing installed
|
 040713_06.jpg Edna Bay, BC - 2004 7/13/04, 2:40PM: Middle wall awash at 10.5' tide. Note 2X6 surface boards installed.
|