 040707_04.jpg Edna Bay, BC - 2004 At last - bathtub (cleaned by Martha) headed from the deck back into the house
|  040707_12.jpg Edna Bay, BC - 2004 Bathtub in position
|  040707_13.jpg Edna Bay, BC - 2004 Bathtub in position and with some paneling installed
|
 040709_04.jpg Edna Bay, BC - 2004 Paneling completed
|  040709_10.jpg Edna Bay, BC - 2004 Primer coat
|  040709_07.jpg Edna Bay, BC - 2004 Primer coat
|
 040709_12.jpg Edna Bay, BC - 2004 Peter admiring the paint jpb
|  040715_01.jpg Edna Bay, BC - 2004 Wiring rerouted - outlet will be in side of vanity
|  040715_03.jpg Edna Bay, BC - 2004 Rerouting shower head water pipe. Supply is on the right. Pipe to shower head will be on left.
|
 040718_02.jpg Edna Bay, BC - 2004 Finished painting and the toilet back in at last
|  040719_04.jpg Edna Bay, BC - 2004 Vanity in place but not plumbed
|  040719_06.jpg Edna Bay, BC - 2004 Cabinet in place but not level
|
 040720_02.jpg Edna Bay, BC - 2004 Cabinet in place, level, secured to wall
|  040720_04.jpg Edna Bay, BC - 2004 Cabinet with doors
|  040721_01.jpg Edna Bay, BC - 2004 The kitchen is returning to normal
|